Facility
This section explains how to add and manage facilities within your organization using the ESG Facility doctype.
ESG Facility Structure
When creating a new facility, you will need to provide the following information:
- Facility Name: The official name of the facility (required)
- Facility Code: A unique code for the facility (required)
- Organization: The organization this facility belongs to (required)
- Parent Facility: (Optional) Link to a parent facility for hierarchical structures
- Facility Type: Select from Factory, Office, Warehouse, Data Center, or Other (required)
- Location: Link to a registered location (address, coordinates)
- Area Size (m²): The total area of the facility (required)
- Energy Capacity (kWh): The energy capacity of the facility (optional)
- Operation Status: Active, Inactive, or Under Construction (required)
- Effective From / To: Dates for when the facility is operational
Steps to Add a New Facility
- Go to ESG Facility
- Click "Add New Facility"
- Fill in the required fields as described above
- Save the facility